A.2.2:6.2 Software service in operations (structural, cyber-physical)
Preface node
heading:a-2-2-6-2-software-service-in-operations-structural-cyber-physical:2171
Content
- Holder:
PlannerService_v4(deployed system). - Task family: job‑shop schedule generation per
JS_Schedule_v4MethodDescription. - WorkScope: 50–500 jobs; 5–40 machines; hard deadlines only; network latency ≤ 20 ms.
- Measures: schedule completion within 0.95 of theoretical optimum (benchmark set), 98 % on‑time delivery in simulation.
- Context:
PlantScheduling_2025. - Use: Steps that “require ScheduleGeneration capability ≥ 0.90 optimality” will only pass if the holder’s capability meets or exceeds that bound.