project alignment
Route
route:project-alignment
- First Honest Burden: role / method / plan / work confusion
For project alignment - contexts, actors, plan vs run, and a first shared work surface: start with A.1.1, then A.15, then A.15.2 / A.15.3, then B.5.1. When method/work vocabulary itself must be aligned across contexts, add F.11 (and F.9 where bridge discipline matters). Land on F.17 (UTS). role / method / work separation and a first work sheet or UTS-ready alignment frame
Ordered steps
- A.1.1 U.BoundedContext: The Semantic Frame
- A.15 Role–Method–Work Alignment (Contextual Enactment)
- A.15.2 U.WorkPlan: The Schedule of Intent
- A.15.3 SlotFillingsPlanItem — Planned Slot-Fillings Baseline (WorkPlanning PlanItem)
- B.5.1 Explore → Shape → Evidence → Operate
- F.11 Method Quartet Harmonisation
- F.9 Alignment & Bridge across Contexts
Landing points
Route surfaces
- J.4 First Practical Entry Route Index
- I.2 Detailed Walk‑throughs
- A.15 Role–Method–Work Alignment (Contextual Enactment)
Typical next owners
- A.15.1 U.Work: The Record of Occurrence
- A.15.2 U.WorkPlan: The Schedule of Intent
- A.15.3 SlotFillingsPlanItem — Planned Slot-Fillings Baseline (WorkPlanning PlanItem)
- B.5.1 Explore → Shape → Evidence → Operate
- F.11 Method Quartet Harmonisation
- F.17 Unified Term Sheet (UTS)
Common wrong reroutes
Citations
Preface/Where to startJ.4